A heaved, cracked, or deteriorating basement floor undermines every finish you'd want to put on top of it. BaseWorks removes the old slab, prepares the subgrade with proper drainage gravel and vapour barrier, and pours a new 4-inch reinforced concrete floor built to hold up through Hamilton's freeze-thaw conditions.
WHEN TO REPLACE
A lot of Hamilton basement floors were originally poured thin - 2 to 3 inches, no vapour barrier, no rebar. Decades of moisture cycling, soil movement, and freeze-thaw have left many of them cracked, heaved, or deteriorated in ways patching just can't fix. When the slab itself has failed structurally, full replacement is the only real solution.
New 4-inch reinforced concrete slab being bull-floated after pour in a Waterdown semi-detached - old 2-inch slab removed, 4 inches of granular A gravel, 10-mil vapour barrier, fibre-reinforced mix.
This follows a specific sequence, and every step matters - a properly built subgrade and vapour barrier are what determine whether the new slab lasts decades or just repeats the same problems as the old one.
SPECIFICATIONS
Every project runs on the same specification baseline - any deviation for specific site conditions gets noted directly in your written quote.
| Element | Specification | Notes |
|---|---|---|
| Slab thickness | 4 inches (100mm) minimum | 4.5 to 5 inches where radiant heat tubing embedded |
| Concrete mix | 25 MPa (3,600 psi) at 28 days | Air-entrained for Hamilton freeze-thaw exposure |
| Reinforcement | Fibre reinforcement standard | Wire mesh 6x6 W1.4xW1.4 available on request |
| Vapour barrier | 10-mil polyethylene | Lapped 6 inches, all seams taped |
| Granular base | Granular A, 4 inches compacted | Increased where existing subgrade is disturbed |
| Control joints | 10-foot grid | Saw-cut within 24-48 hours of pour |
| Finish | Smooth steel trowel | Broom finish available for epoxy or tile adhesion |
| Foot traffic | 7 days minimum | 28 days to full design strength |
COMMON QUESTIONS
What Hamilton homeowners ask most about basement slab replacement.
Typically $8 to $18 per square foot, covering old slab removal, subgrade preparation, gravel base, vapour barrier, and the new 4-inch reinforced slab. A standard 600 sq ft basement runs $5,000 to $11,000 all-in. Every quote is fixed-price and written, following a free site assessment.
Replacement makes sense when the floor is heaved or cracked from frost movement, deteriorated from water infiltration, originally poured too thin to support a finished floor load, needs to sit at a new elevation after underpinning, or has surface contamination that prevents proper adhesion of a new finish. None of that gets fixed by patching a structurally failed slab.
A straightforward floor replacement that doesn't change the finished elevation typically doesn't need its own permit. When it's part of a larger basement lowering, underpinning, or waterproofing project that's already permitted, the floor replacement usually falls under that existing permit. We'll flag exactly what applies during the free assessment.
4 inches minimum is the standard for residential use, and that's what we build to as default, with wire mesh or fibre reinforcement included. Where the floor needs to carry heavy point loads - steel columns, heavy equipment - a thicker slab or additional rebar gets specified instead.
Typically 3 to 5 days for a standard residential basement: a day for saw-cutting and slab removal, a day for subgrade prep and gravel, and a day for vapour barrier and the concrete pour itself. The new slab then needs a minimum 7-day cure before foot traffic and 28 days to reach full strength before flooring goes on.
Yes - in-floor hydronic or electric radiant heat installs directly into a new slab. We coordinate with the hydronic or electrical contractor to get heating elements or tubing in place before the pour, and make sure the slab thickness is adequate to embed the system properly.
Our concrete floor replacement Hamilton crews work across the city, whether it's a standalone job or part of a larger underpinning, waterproofing, or finishing project.
We assess your existing slab condition, subgrade, and moisture situation in person, then remove the old floor and pour a proper 4-inch reinforced slab with vapour barrier - fixed-price contract, start to finish.